LAESA Pimentel Phase II
LAESA Pimentel Phase II The enlargement process in August 2007 announced the power company Electricidad de Santiago (LAES) is still within the schedule. Of the 30 megawatts that was available in Pimentel went to 60 megs in October 2009
LAESA Pimentel Phase III
The engines in Pimentel Phase 3 are almost twice as large as those installed in earlier phases. The complete Wärtsilä 18V46 diesel generating set is 18 metres long, five metres wide and has a height of six metres measured
Building Inspiring Spaces
Laesa’s Research and Development department, headed by Dr. Scott Cramton, has had tremendous success in reducing the amount of fossil fuels required by these engines. New technology has allowed Laesa to create a new bio-fuel gas to supplement the carbon based fuels thereby lowering the fuel consumption and making a significant reduction in green house gases.